PROJECT THREE:
P3 documentation/project homepage.

Timeline of construction (rough outline):
1 week=at least 4-7hrs a day for3-5 days out of 7.
2 weeks for collage creation (project 1)
1 week brainstorming and storyboarding
2 weeks programming the moveable collage
1 week doing design and writing.

more details to come, including: drafts of the 'funny' pages that were much less funny, screen shots of the moveable collage being tested, and some other stuff.

***Plans for the future include: 1. Change navigation (many things to do here). 2. At the static collage, take out pins and make the mouse cursor a pin, so that the user is doing the dissection. 3. Make sure all the pages are using the template, making updates easier. 4. Expand the story to all of the collage parts, and double the story for each element (two storylines to follow, mirror universe type thing).


PROJECT TWO:
1. P2 theory and documentation.
2. P2 radio movie.

Timeline of construction (rough outline):
1 week=at least 4-7hrs a day for2-3 days out of 7.
1 week brainstorming and storyboarding (research,read sciam article,links made, etc.)
1 week doing design (new collage and writing presentation outline).


PROJECT ONE:
1. P1 construction materials.
2. P1 image and theory


Timeline of construction:
1 week=at least 4-7hrs a day for2-3 days out of 7.
~1 week brainstorming and storyboarding (bought 8 magazines with good images, mix of scientific magazines and art/fashion magazines)
1.5 week doing design (cutting out the images, trimming with exacto knife, and arranging into final configuration, spray mount, dizziness).